Enkapsulet Steel Hevi-Diuti Raised Floa

Askim wok painimaut
Enkapsulet Steel Hevi-Diuti Raised Floa
Ol infomesen
Dispela sistem i bungim wanpela 'steel panel' we i gat olgeta 'encapsulated' wantaim wanpela 'steel pedestal' we yu ken stretim na ol 'heavy-duty stringers. Dispela i kamapim wanpela plenum aninit long plua we ol manmeri i ken go insait long en bilong ol pawa kebol i gat planti pawa, ol data netwok, na HVAC eaflo.
Kategori
Floaring we i stap antap long ain
Share to
Diskripsen

FINECO Encapsulated Steel Hevi-Duti Raised Floor

 

Hai-Lod Akses Floa bilong ol Data Senta, Seva Rum na Teknikel Fasiliti
FINECO Encapsulated Steel Heavy-Duty Raised Floor em i wanpela 'modular access flooring system' we ol i wokim bilong putim bikpela hevi long plua, strongim straksa, na kisim sevis aninit long plua.
Dispela sistem i bungim wanpela 'steel panel' we i gat olgeta 'encapsulated' wantaim wanpela 'steel pedestal' we yu ken stretim na ol 'heavy-duty stringers. Dispela i kamapim wanpela plenum aninit long plua we ol manmeri i ken go insait long en bilong ol pawa kebol i gat planti pawa, ol data netwok, na HVAC eaflo.

 

Ol bikpela samting

 

Hevi-Diuti Lod Pefomens:Ol i wokim bilong ol teknikel spes we i gat planti na hevi roling ikwipmen lod.
Fully Encapsulated Steel Design:Ol 'welded steel shell' i save lukautim insait bilong 'inner core' long wara na bagarap, na i save mekim 'dimensional stability' i stap longpela taim.
Strongpela Andastraksa:Ol 'steel pedestal' we yu ken stretim i save kamapim stretpela mak, na ol 'snap-on' o 'bolted stringers' i save givim 'lateral grid stability'.
Ol Modular Panel we yu ken rausim:Ol wanwan panel i save apim isi tru long mekim mentenens na i no bagarapim ol infrastraksa i stap klostu.
Ol kain kain pinis bilong pes:Faktori-i putim HPL, konduktiv ESD vinil, o ol 'bare finish' we i stret long ol spesifikesen bilong projek.

 

Sistem straksa na komposesen

 

Pinis bilong pes:Anti-static HPL / Conductive PVC
Top Stiel Sit:Hai-greid 'galvanized steel' we i givim wanpela gutpela antap pes.
Engineered Core:Hai-densiti patikel bod o laitweit simen kor.
Ain pepa aninit:Dip-fom ain pepa wantaim ol liklik hul bilong strongim 'flexural rigidity'.
Katim arere:Protektiv ed banding bilong seif hanling na tait modular alainmen.
Pedestal & Stringer Network:Ol 'electro-galvanized steel pedestals wantaim ol 'vibration-proof locking mechanisms na ol opsenel 'tubular stringers'.

 

Sistem Lod Pefomens

 

Ol i skelim olsem wanpela gutpela sistem (Panel + Pedestal + Stringer) bihainim CISCA na EN 12825 standet.

Pefomens Paramita

FINECO Spesifikasen

Test Standet

Konsentreted Lod

4.45 kN i go long 6.67 kN

CISCA / EN 12825

Yunifom Distributed Lod

15.0 kN/m2 i go long 23.0 kN/m2

CISCA / EN 12825

Roling Lod

2.5 kN i go long 4.5 kN (10,000 saikel)

CISCA

Laspela lod

>3x Konsentreted Reting

Pruf Lod Tes

Maksimum Difleksen

Liklik o wankain olsem 2.0 mm (Aninit long wok lod)

CISCA

Sefti Fakta

3.0

Standet bilong Enjiniaring

 

Teknikel Spesifikasen

 

Samting

Ol Teknikel Ditel

Standet Sais bilong Panel

600 × 600 mm (Ol kastom sais i stap)

Tiknes bilong Panel

30 mm i go long 35 mm

Tiknes bilong ain

0.5 mm i go long 0.8 mm hai-greid ain

Bikpela samting

Hai-Densiti Patikel Bod / Simen

Hevi bilong Panel

Klostu. 13 kg – 16 kg / panel

Pedestal Height Range

Standet: 150 mm – 1000 mm

Paia Pefomens

Non-Combustible / Flame Retardant Core

Elektrikel Resistens

1 × 106 i go long 1 × 109 Ω (ESD kompliant)

 

Ol opsen bilong pinisim pes

 

Hai Presa Laminet (HPL):Bikpela 'wear-resistens bilong ol standet data senta na ol rum bilong bosim.
Kondaktiv / ESD Pinisim:Em i bikpela samting long wokim ol samting bilong elektronik na ol 'sensitive server' spes.
PVC / Vinyl Finish:Kost-ifektiv, isi-long-klin solusen bilong ol teknikel opis.
Bare Panel:Redi long sait-ol kapet o ol spesel pinis.

 

Ol aplikesen

 

Ol Data Senta na Ol Rum Bilong Seva:Hai-densiti kebol routing na andafloa ea distribusen.
Ol Rum bilong Pawa na Pawa:Hevi-sapot bilong UPS sistem, bateri stoa, na switjgia.
Ol Rum bilong Kontrol na Telekom:'Vibration-resistant floaring bilong 24/7 monitoring hubs.
Indastrial Teknikel Fasiliti:Strongpela 'access flooring' bilong ol 'automated production lines'.

 

Kwaliti Kontrol na Wokim

 

Sekim ol Raw Material:Ol strongpela sekim long 'steel thickness', 'core density', na ol 'anti-coating' bilong 'corrosion'.
Dimensional Accuracy:Laser-i sekim longpela, skwe, na flat (±0.2 mm).
Lod Testing:Random sample testing i bihainim CISCA na EN 12825 standet.
Pastaim long Sekim Sipmen:Laspela verifikasen bilong paket, lebol, na ol 'hardware' i gutpela olgeta.

 

Instolesen Sekwens

Redim sabfloa:Klinim na stretim 'structural slab'.

Pedestal Layout:Putim ol 'pedestal' bihainim 'modular grid'.

Stretim Hait:Skelim ol 'pedestal' i go long 'Finished Floor Height' (FFH) we yu makim.

Putim Stringer:Konektim ol 'stringer' long ol het bilong 'pedestal' bilong mekim 'grid' i stap gut.

Putim Panel:Putim ol panel insait long grid we yu pinisim pinis.

Laspela lainim:Sekim olgeta level na panel fit.

 

Ol Askim Planti Taim

 

Q: Dispela sistem inap long sapotim ol hevi 'server rack' na 'battery cabinet'?

A: Yes. Ol hevi-diuti sistem bilong FINECO em ol i wokim stret long ol bikpela data senta. Mipela i save stretim 'panel load class' na 'understructure' bihainim stret hevi bilong 'rack', 'footprint', na 'wheel loads' bilong yu.

Q: Ol i mas putim ol 'stringer' long ol hevi-diuti plua we i go antap?

A: Ol i save laikim tru ol 'stringer' na planti taim ol i save nidim long ol hevi-diuti aplikesen o taim ol i pinisim floa hait i winim standet level, long wanem, ol i save helpim tru 'lateral stability' na 'rolling-load performance.

Q: Panel lod kapasiti i wankain olsem sistem lod kapasiti?

A: Nogat. Pefomens bilong wanpela 'raised floor' i dipen long wok bung bilong panel, 'pedestal', na 'stringer'. Mipela i save skelim na testim ol sistem bilong mipela olsem wanpela gutpela straksel yunit.

Q: FINECO inap long givim ol 'third-'tes ripot na ol piksa bilong CAD?

A: Yes. Mipela i save givim ol gutpela teknikel paket, olsem ol CISCA/EN tes ripot, ol prodak data pepa, na ol CAD leit droing bilong sapotim ol projek sabmital na ol enjiniaring tok orait.

Q: Wanem em i standet taim bilong ol intanesenel oda?

A: Ol taim bilong wok i save senis bihainim namba bilong projek na ol samting yu laik mekim (planti taim 2 i go inap 4-pela wik). Yu ken toktok wantaim ol sels tim bilong mipela wantaim projek skel bilong yu long kisim stretpela sediul.

Hot Tag: encapsulated steel heavy-duty raised floor, China encapsulated steel heavy-duty raised floor manufacturers, suppliers, factory

Askim wok painimaut