Enkapsulet Steel Ventilated Raised Floor
Steel Raised Access Flooring bilong ol Data Senta, Seva Rum na Teknikel Fasiliti
FINECO Encapsulated Steel Ventilated Raised Floor em i wanpela 'modular access flooring system' we ol i wokim bilong ol teknikel envairomen we i nidim 'uir distribution' aninit long plua, 'structural performance', na 'sevis accessibility'.
Dispela sistem i bungim ol 'enclosed steel panel' wantaim ol 'ventilated units' long kamapim wanpela 'underfloor plenum' we ol manmeri i ken go insait long en bilong putim ol 'conditioned air', ol pawa kebol, na ol data lain. Ol strongpela na 'ventilated' panel i save bung insait long wanpela grid tasol long stretim ol samting bilong mekim kol na lod.
Ol bikpela gutpela samting bilong prodak
Distribusen bilong win we ol i bosim:I save stiaim win we i gat kondisen long en i kam long plenum aninit long plua i go long ol hap we i gat planti hat.
Steel Core we i stap insait olgeta:Ol 'steel structure' we i stap klostu i givim wanpela strongpela, strongpela, na gutpela ples bilong go insait long en.
Fleksibel Airflow:Ol op eria we yu ken stretim na ol 'damper' we yu ken makim i sapotim stretpela 'rum-level ea balensing.
Bikpela Lod Kapasiti:Ol i wokim bilong sapotim ol hevi IT hatwea, ol seva rek, ol bateri, na mentenens trefik.
Panel Konstraksen
FINECO em i wanpela gutpela, integreted ekses floa sistem na i no ol 'isolated vent tiles'.
Top pinis:Opsenel anti-statik HPL, konduktiv vinil, PVC, o bare steel.
Steel Shell:Ol i bin weldim na karamapim olgeta ain konstraksen bilong mekim strongpela straksa.
Seksen we i gat win:Ol gutpela hul o 'grates' we ol i wokim bilong givim gutpela 'airflow'.
Struksa bilong daunbilo:Protektiv steel aninit sait i banisim insait bilong en.
Andastraksa:Ol hevi-duti ain pedestal we yu ken stretim na ol opsenel stringa we i mekim plua i stap gut.
Ol spesifikasen bilong win na kol
|
Paramita |
FINECO Spesifikasen |
|
Kain Panel |
Ol i gat hul / Grated / Kastom |
|
Open Eria |
15% – 35% (Yu ken stretim) |
|
Ret bilong ron bilong win |
Ol i wokim bilong soim presa we i no senis |
|
Kontrol bilong ron bilong win |
Ol 'sliding dampers' we yu ken makim |
|
Standet Sais |
600 × 600 mm |
|
Rot bilong win |
Vertikal / Adjustable |
Struktural Lod Pefomens
Ol i wokim bihainim ol standet bilong wol olsem CISCA na EN 12825.
|
Paramita |
Pefomens Benchmak |
|
Konsentreted Lod |
4,450 N – 6,670 N (Configurable) |
|
Yunifom Lod |
10 kN/m2 – 23 kN/m2 (Yu ken stretim) |
|
Laspela lod |
>3× Konsentreted Lod |
|
Roling Lod |
3,000 N – 4,500 N (10,000 saikel) |
|
Difleksen Klas |
Klas A / Klas B |
Teknikel Spesifikasen Samari
|
Samting |
Ol Ditel bilong Spesifikasen |
|
Kain Prodak |
Steel Raised Access Floor System |
|
Sais bilong Panel |
600 × 600 mm |
|
Ol Samting Bilong Panel |
Fuli Enkapsulet Welded Steel |
|
Elektrikel Resistens |
106 i go long 109 ohms (Anti-static) |
|
Paia Pefomens |
Klas A / Non-kombustibel kor opsen |
|
Pedestal Height Range |
150 mm i go long 1,500 mm (Yu ken stretim) |
|
Ol Praimeri Aplikesen |
Data Senta, Seva Rum, Telekom Hab |
Ol opsen bilong pinisim pes
Anti-Static HPL:Gutpela bilas leit wantaim ol lektrikel samting bilong ol seva rum.
Vinyl we i save karim pawa:Bikpela 'static dissipation' wantaim isipela mentenens bilong ol kontrol fasiliti.
PVC pinis:Kost-ifektiv, praktikel solusen bilong ol teknikel ikwipmen zon.
Pedestal & Andastraksa Sapot
Ol 'Steel Pedestals' we yu ken stretim:Em i stretim hevi bilong 'subfloor' we i no stret na i makim stretpela 'finish floor height' (FFH).
Stringer System:Ol 'snap-on o bolted steel profiles we i givim 'lateral rigidity' long ol 'high-load zones.
Sevis Kaviti:Hait, klinpela rot bilong pawa routing, netwok kebol, na HVAC lain.
Ol aplikesen
Ol Data Senta & Co-ples Fasiliti:Em i skelim gut 'high-density cooling wantaim hevi 'structural support'.
Ol rum bilong seva na telekom:Em i stretim ol hevi kebol na givim gutpela 'rack cooling'.
Komand na Kontrol Senta:Em i givim wanpela gutpela, 'vibration-fri envairomen bilong ol teknikel desk.
Instolesen Wokflo
Redim sabfloa:Klinim na pasim simen bilong as bilong en.
Grid Layout:Makim ol ples bilong 'pedestal' bihainim ol piksa bilong ol enjinia.
Stretim Hait:Levelim ol 'pedestals' bilong kamapim mak bilong FFH.
Stringer Plesmen:Pasim gut ol 'stringers' bilong mekim 'lateral stability' i stap gut (sapos ol i makim).
Putim Panel:Putim ol strongpela na win i go insait long grid.
Laspela sekim:Sekim 'level alignment', 'stability', na 'airflow distribution'.
Komplitim ol sistem komponen
Ol panel we i gat win na strongpela
Zoning bilong plua.
Ol Pedestal & Stringers
As tingting bilong straksa.
Ol 'airflow dampers'
Ol valv bilong bosim volium.
Ol Kebol Gromet
Ol pas-tru bilong ol lain i pas.
Ol Lifta na Ramp i go insait
Ol tul bilong lukautim na ol senis bilong ADA.
Kwaliti Kontrol na Kompliens
Multi-Stej Inspeksen:Ol sekim bilong ol samting, ol 'dimensional tolerances', ol 'flatness testing', na 'load verification'.
Ol pepa:Ol ripot bilong tes bilong mil, ol teknikel droing, na ol rekot bilong bihainim lo ol i givim long ol projek rikwaemen pastaim long ol i salim i go.
Ol Askim Planti Taim
Q: Wanem samting em i wanpela 'encapsulated steel' we i gat 'ventilated raised floor'?
A: Wanpela 'modular access flooring system' we i yusim ol 'enclosed steel panels' wantaim ol 'engineered perforations' bilong givim kol win na haitim ol sevis aninit long plua.
Q: Ol i ken miksim ol 'ventilated' na 'solid' panel?
A: Yes. Ol i pas gut wantaim insait long wankain 600 × 600 mm grid leit.
Q: Ol i ken senisim 'airflow rates'?
A: Yes, ol opsenel aninit long-panel dampa i save bosim win volium.
Q: Wanem ol intanesenel standet yu sapotim?
A: Ol i ken stretim ol sistem long bihainim CISCA na EN 12825 spesifikasen.
Q: FINECO inap long givim ol droing na ol sempel bilong enjiniaring?
A: Yes, ol CAD droing, ol data pepa, na ol projek sempel i stap sapos yu askim.
Hot Tag: 'encapsulated steel' we i gat 'ventilated raise floor', Saina 'encapsulated steel' i gat 'ventilated raised floor' ol man bilong wokim, ol saplaia, faktori
