Enkapsulet Steel Ventilated Raised Floor

Askim wok painimaut
Enkapsulet Steel Ventilated Raised Floor
Ol infomesen
Dispela sistem i bungim ol 'enclosed steel panel' wantaim ol 'ventilated units' long kamapim wanpela 'underfloor plenum' we ol manmeri i ken go insait long en bilong putim ol 'conditioned air', ol pawa kebol, na ol data lain. Ol strongpela na 'ventilated' panel i save bung insait long wanpela grid tasol long stretim ol samting bilong mekim kol na lod.
Kategori
Floaring we i stap antap long ain
Share to
Diskripsen

Enkapsulet Steel Ventilated Raised Floor

 

Steel Raised Access Flooring bilong ol Data Senta, Seva Rum na Teknikel Fasiliti
FINECO Encapsulated Steel Ventilated Raised Floor em i wanpela 'modular access flooring system' we ol i wokim bilong ol teknikel envairomen we i nidim 'uir distribution' aninit long plua, 'structural performance', na 'sevis accessibility'.
Dispela sistem i bungim ol 'enclosed steel panel' wantaim ol 'ventilated units' long kamapim wanpela 'underfloor plenum' we ol manmeri i ken go insait long en bilong putim ol 'conditioned air', ol pawa kebol, na ol data lain. Ol strongpela na 'ventilated' panel i save bung insait long wanpela grid tasol long stretim ol samting bilong mekim kol na lod.

 

Ol bikpela gutpela samting bilong prodak

 

Distribusen bilong win we ol i bosim:I save stiaim win we i gat kondisen long en i kam long plenum aninit long plua i go long ol hap we i gat planti hat.
Steel Core we i stap insait olgeta:Ol 'steel structure' we i stap klostu i givim wanpela strongpela, strongpela, na gutpela ples bilong go insait long en.
Fleksibel Airflow:Ol op eria we yu ken stretim na ol 'damper' we yu ken makim i sapotim stretpela 'rum-level ea balensing.
Bikpela Lod Kapasiti:Ol i wokim bilong sapotim ol hevi IT hatwea, ol seva rek, ol bateri, na mentenens trefik.

 

Panel Konstraksen

 

FINECO em i wanpela gutpela, integreted ekses floa sistem na i no ol 'isolated vent tiles'.
Top pinis:Opsenel anti-statik HPL, konduktiv vinil, PVC, o bare steel.
Steel Shell:Ol i bin weldim na karamapim olgeta ain konstraksen bilong mekim strongpela straksa.
Seksen we i gat win:Ol gutpela hul o 'grates' we ol i wokim bilong givim gutpela 'airflow'.
Struksa bilong daunbilo:Protektiv steel aninit sait i banisim insait bilong en.
Andastraksa:Ol hevi-duti ain pedestal we yu ken stretim na ol opsenel stringa we i mekim plua i stap gut.

 

Ol spesifikasen bilong win na kol

 

Paramita

FINECO Spesifikasen

Kain Panel

Ol i gat hul / Grated / Kastom

Open Eria

15% – 35% (Yu ken stretim)

Ret bilong ron bilong win

Ol i wokim bilong soim presa we i no senis

Kontrol bilong ron bilong win

Ol 'sliding dampers' we yu ken makim

Standet Sais

600 × 600 mm

Rot bilong win

Vertikal / Adjustable

 

Struktural Lod Pefomens

 

Ol i wokim bihainim ol standet bilong wol olsem CISCA na EN 12825.

Paramita

Pefomens Benchmak

Konsentreted Lod

4,450 N – 6,670 N (Configurable)

Yunifom Lod

10 kN/m2 – 23 kN/m2 (Yu ken stretim)

Laspela lod

>3× Konsentreted Lod

Roling Lod

3,000 N – 4,500 N (10,000 saikel)

Difleksen Klas

Klas A / Klas B

 

Teknikel Spesifikasen Samari

 

Samting

Ol Ditel bilong Spesifikasen

Kain Prodak

Steel Raised Access Floor System

Sais bilong Panel

600 × 600 mm

Ol Samting Bilong Panel

Fuli Enkapsulet Welded Steel

Elektrikel Resistens

106 i go long 109 ohms (Anti-static)

Paia Pefomens

Klas A / Non-kombustibel kor opsen

Pedestal Height Range

150 mm i go long 1,500 mm (Yu ken stretim)

Ol Praimeri Aplikesen

Data Senta, Seva Rum, Telekom Hab

 

Ol opsen bilong pinisim pes

 

Anti-Static HPL:Gutpela bilas leit wantaim ol lektrikel samting bilong ol seva rum.
Vinyl we i save karim pawa:Bikpela 'static dissipation' wantaim isipela mentenens bilong ol kontrol fasiliti.
PVC pinis:Kost-ifektiv, praktikel solusen bilong ol teknikel ikwipmen zon.

 

Pedestal & Andastraksa Sapot

 

Ol 'Steel Pedestals' we yu ken stretim:Em i stretim hevi bilong 'subfloor' we i no stret na i makim stretpela 'finish floor height' (FFH).
Stringer System:Ol 'snap-on o bolted steel profiles we i givim 'lateral rigidity' long ol 'high-load zones.
Sevis Kaviti:Hait, klinpela rot bilong pawa routing, netwok kebol, na HVAC lain.

 

Ol aplikesen

 

Ol Data Senta & Co-ples Fasiliti:Em i skelim gut 'high-density cooling wantaim hevi 'structural support'.
Ol rum bilong seva na telekom:Em i stretim ol hevi kebol na givim gutpela 'rack cooling'.
Komand na Kontrol Senta:Em i givim wanpela gutpela, 'vibration-fri envairomen bilong ol teknikel desk.

 

Instolesen Wokflo

01/

Redim sabfloa:Klinim na pasim simen bilong as bilong en.

02/

Grid Layout:Makim ol ples bilong 'pedestal' bihainim ol piksa bilong ol enjinia.

03/

Stretim Hait:Levelim ol 'pedestals' bilong kamapim mak bilong FFH.

04/

Stringer Plesmen:Pasim gut ol 'stringers' bilong mekim 'lateral stability' i stap gut (sapos ol i makim).

05/

Putim Panel:Putim ol strongpela na win i go insait long grid.

06/

Laspela sekim:Sekim 'level alignment', 'stability', na 'airflow distribution'.

Komplitim ol sistem komponen

 

Ol panel we i gat win na strongpela

Zoning bilong plua.

Ol Pedestal & Stringers

As tingting bilong straksa.

Ol 'airflow dampers'

Ol valv bilong bosim volium.

Ol Kebol Gromet

Ol pas-tru bilong ol lain i pas.

Ol Lifta na Ramp i go insait

Ol tul bilong lukautim na ol senis bilong ADA.

 

Kwaliti Kontrol na Kompliens

 

Multi-Stej Inspeksen:Ol sekim bilong ol samting, ol 'dimensional tolerances', ol 'flatness testing', na 'load verification'.
Ol pepa:Ol ripot bilong tes bilong mil, ol teknikel droing, na ol rekot bilong bihainim lo ol i givim long ol projek rikwaemen pastaim long ol i salim i go.

 

Ol Askim Planti Taim

 

Q: Wanem samting em i wanpela 'encapsulated steel' we i gat 'ventilated raised floor'?

A: Wanpela 'modular access flooring system' we i yusim ol 'enclosed steel panels' wantaim ol 'engineered perforations' bilong givim kol win na haitim ol sevis aninit long plua.

Q: Ol i ken miksim ol 'ventilated' na 'solid' panel?

A: Yes. Ol i pas gut wantaim insait long wankain 600 × 600 mm grid leit.

Q: Ol i ken senisim 'airflow rates'?

A: Yes, ol opsenel aninit long-panel dampa i save bosim win volium.

Q: Wanem ol intanesenel standet yu sapotim?

A: Ol i ken stretim ol sistem long bihainim CISCA na EN 12825 spesifikasen.

Q: FINECO inap long givim ol droing na ol sempel bilong enjiniaring?

A: Yes, ol CAD droing, ol data pepa, na ol projek sempel i stap sapos yu askim.

Hot Tag: 'encapsulated steel' we i gat 'ventilated raise floor', Saina 'encapsulated steel' i gat 'ventilated raised floor' ol man bilong wokim, ol saplaia, faktori

Askim wok painimaut